DISCLAIMER: This is an industry reference article based on publicly available reporting. Hebei Haihao makes no claim of supply, EPC participation, or commercial relationship with any company or contractor named in this article. All information is sourced from public news, corporate releases, and industry publications.
1. Project Background
The Egyptian Refining Company (ERC) Mostorod project is a greenfield-style hydrocracker complex built within the existing Mostorod Petroleum Complex, located approximately 20 km northeast of Cairo. The project is structured to upgrade fuel-oil-rich feed from the existing Cairo Oil Refining Company (CORC) infrastructure into Euro V transportation fuels for the Egyptian market.
According to public reporting, the Egyptian Refining Company Mostorod refinery was officially inaugurated in September 2020, with full startup and steady-state production rates achieved at the key process units shortly after.
For international procurement engineers, the ERC Mostorod hydrocracker remains a useful reference for North Africa refinery procurement and for hydrocracker-class material specs.
2. Scale by the Numbers
| Parameter |
|---|





