DISCLAIMER: This is an industry reference case based on public news and EPC contractor announcements. Hebei Haihao makes no claim of supply, EPC participation, or commercial relationship with any contractor named. This article is intended for international buyers tracking the LNG procurement pipeline.

1. Why NFE/NFS Is the World's Largest Single LNG Buildout
QatarEnergy is executing the largest concentrated LNG capacity expansion in the world from a single field — the North Field, offshore Qatar. The two phases together add nearly 49 MTPA of new liquefaction capacity:
| Project phase | Capacity addition | Scope |
|---|---|---|
| Pre-expansion (existing) | 77 MTPA | 14 LNG trains in Ras Laffan |
| North Field East (NFE) | +33 MTPA → 110 MTPA | 4 × 8 MTPA new trains |
| North Field South (NFS) | +16 MTPA → 126 MTPA | 2 × 8 MTPA new trains |
NFE was originally targeted for first LNG by year-end 2025; per QatarEnergy / LNG Industry / MEES updates through late 2025, the first train has slipped to mid-2026 (Q3 2026) and full four-train completion to mid-2028.
2. The Contractor Map (Publicly Announced)
| Scope | EPC contractor (announced) | Year |
|---|---|---|
| Onshore 4 × 8 MTPA trains, CCS, gas treatment, NGL recovery, helium extraction | CTJV (Chiyoda + Technip Energies) | Feb 2021 |
| Offshore EPCI: 8 wellhead topsides, 500 km of pipelines, 225 km of 33 kV subsea cables | McDermott | Jan 2022 |
| Sulfur handling / off-plot LSTK EPC | TR-Wison (Técnicas Reunidas + Wison Engineering JV) | Apr 2022 |
| Additional NFS off-plot scope (LNG rundown lines, BOG recovery, utility piping) | TR-Wison (additional award) | 2023+ |
Total NFE-phase value reported at approximately US$ 28.75 bn by Offshore Energy.
3. Pipe & Fittings Demand Profile of an 8 MTPA LNG Train
Based on what an 8 MTPA LNG train typically procures (generic technical context, not project-specific BOM):
Cryogenic Section (post-liquefaction)
- 9% Ni steel (ASTM A553 plate / A333 Gr 8 pipe) for LNG rundown lines, storage tank inlet
- 304 / 304L SS (ASTM A312 / A403 fittings) for BOG (boil-off gas) and N₂ purge lines
- ASME B16.9 elbows, tees, reducers
- ASME B16.28 short-radius fittings where compactness matters
- ASME B16.5 / B16.47 Series A flanges with RTJ gaskets
Feed Gas Section (pre-liquefaction)
- Low-temperature carbon steel (A420 WPL6 fittings, A350 LF2 flanges) for cold feed gas
- Large-bore carbon steel (A234 WPB) for warm feed
- NACE MR0175 sour-service compliance for any wet-H₂S feed segments
Piping Codes
- ASME B31.3 process piping
- Charpy V-notch impact testing per ASME B31.3 paragraph 323.3
4. Subsea & Offshore Scope
McDermott's offshore contract physically delivers:
- 8 wellhead topsides
- ~ 500 km of subsea pipelines
- 225 km of 33 kV subsea cables
A pipe-lay scope of this size typically draws on:
- DSAW (Double Submerged Arc Welded) large-OD line pipe
- Induction bends for shore approach and direction changes
- Mechanical connectors and forged hubs for subsea tie-ins
- ASME B16.49 induction bends for cross-country and shore-approach segments
- DNV-OS-F101 subsea pipeline-system code applicability
5. Procurement Challenges Qatar's Mega-LNG Wave Creates
When NFE and NFS run in parallel with comparable LNG buildouts in the US Gulf Coast (Venture Global, Cheniere expansion), the global supply chain experiences:
- 9% Ni plate capacity tightness — limited number of mills worldwide qualified to roll heavy-section 9% Ni
- Low-temp forging draw — A350 LF2 / LF3 long-lead items
- Cryogenic-qualified fitting shops — fewer than 20 globally with full cryogenic Charpy test capability + 9% Ni welding
- Vendor approval cycles — QatarEnergy's QP/QE Approved Manufacturer List is a 12-18-month qualification process similar to SAP-Aramco
- Logistics — most supply ships from Asia and Europe to Ras Laffan; freight scheduling matters
6. Reference Takeaway for International Buyers
For trading houses and Tier-2 LNG project owners:
- Studying NFE/NFS spec packages (where publicly available) is one of the cleanest ways to understand a current state-of-art LNG bid spec
- Vendor qualification on a current Tier-1 LNG terminal dramatically improves credentials for the next wave (Tier-2 projects in 2026-2028 in the US, Mozambique, PNG, Australia)
- Watch the 2025-2027 EPC announcements — they tend to drag in long-lead fittings demand 12-18 months ahead
This article is provided as an industry reference. Hebei Haihao does not claim involvement in NFE/NFS or any related package.
Sources: QatarEnergy public releases, Offshore Technology, Offshore Energy, Chiyoda Corporation, Technip Energies, Tecnicas Reunidas, McDermott public announcements.
Related Products
For physical supply of the specs discussed above, refer to the relevant Hebei Haihao product categories:
Or browse the full product catalogue and filter by ASTM / ASME / EN / GB standards, material grades, and size ranges.
Further Reading
- ASTM A420 WPL6 Charpy impact test for low-temperature fittings
- Saudi Aramco Jafurah & Master Gas demand outlook
Next Steps
- This article is a procurement reference; all standard numbers, chemistry limits, and process parameters defer to the latest published edition
- For project RFQs, submit your specs via the inquiry form; we respond within 4 business hours
- Factory certifications and inspection capability are listed on the certificates page
Need a quote for the products mentioned in this article?
Submit your specs and our pressure piping team will respond within one business day.
Send RFQRelated reading
Case studiesKuwait Al-Zour LNG Import Terminal Procurement Reference
KIPIC's Al-Zour LNG terminal in Kuwait reaches 22 mtpa with eight 225,000 cbm tanks. Reference for Middle East LNG import infrastructure sourcing.
Case studies